| NFPA 72 §1.5 | Equivalency: technical documentation to the AHJ, AHJ approval | L3 Shop Dwgs |
| NFPA 72 §7.2.1 | Minimum required documentation, including mounting heights and sound pressure levels | L3 Shop Dwgs |
| NFPA 72 §7.3 | Design documents: pathway class and survivability designations | L3 Shop Dwgs |
| NFPA 72 §7.4.4–7.4.5 | General information, date of issue and revisions; floor plan contents | L3 Shop Dwgs |
| NFPA 72 §7.4.6–7.4.8 | Riser diagram, control unit diagram, and typical wiring contents | L3 Shop Dwgs |
| NFPA 72 §7.4.9–7.4.10 | Sequence of operation and required calculations | L3 Shop Dwgs |
| NFPA 72 §10.3 | Equipment listed for the purpose and compatible with the control unit | L3 Shop Dwgs |
| NFPA 72 §10.4.4–10.4.7 | Control unit heights; smoke detection at control equipment; abandoned equipment | L3 Shop Dwgs |
| NFPA 72 §10.5 | Personnel qualifications, including system designers | L3 Shop Dwgs |
| NFPA 72 §10.6.7.2 | Secondary power: 24 h + 5 min (15 min voice); 1.25 correction factor | L3 Shop Dwgs |
| NFPA 72 §10.17 | Notification appliance circuits and supervised control circuits | L3 Shop Dwgs |
| NFPA 72 §12.3 and §12.4 | Pathway classes and survivability levels | L3 Shop Dwgs |
| NFPA 72 Table 17.6.3.5.1 | Heat detector spacing reduction by ceiling height | L3 Shop Dwgs |
| NFPA 72 §17.7.4.2.3–17.7.4.2.4 | Smoke detector spacing, 0.7S, and beams; §17.7.4.6 for air sampling | L3 Shop Dwgs |
| NFPA 72 §18.4.4.1 and §18.4.6 | Public-mode and sleeping-area audibility (Annex D covers intelligibility) | L3 Shop Dwgs |
| NFPA 72 Table 18.5.5.7.1(a)/(b) | Room spacing candela; §18.5.5.6–18.5.5.10 for obstructions, corridors, sleeping | L3 Shop Dwgs |
| NFPA 72 §21.3–21.4, §21.8, §23.8.5.1.3 | Elevator recall and shutdown, hoistway devices, HVLS fan interlock, dedicated-function systems | L3 Shop Dwgs |
| NFPA 72 §7.5.2 | Installing contractor's written statement: installed per approved plans, tested per manufacturer and NFPA | L3 Install |
| NFPA 72 §7.5.3 | Documents delivered to the owner at final acceptance | L3 Install |
| NFPA 72 §7.5.4 | Owner's manual contents (narrative, matrix, operator instructions, service directory, data sheets) | L3 Install |
| NFPA 72 §7.5.5 | Record (as-built) drawings and sequence as programmed | L3 Install |
| NFPA 72 §7.5.6 | Record of completion: who completes it, revisions, lost original, electronic filing | L3 Install |
| NFPA 72 §7.5.7 | Site-specific software: passcode, programming password, on-site copy memory type | L3 Install |
| NFPA 72 §7.5.8 | Verification: functions per plans, documents archived, corrections confirmed in writing | L3 Install |
| NFPA 72 §7.7.1-7.7.2 | Record availability and archiving; SYSTEM RECORD DOCUMENTS cabinet; nothing stored in the control unit | L3 Install |
| NFPA 72 §10.4.4 | Control unit display and control mounting heights (6 ft maximum, 15 in. minimum) | L3 Install |
| NFPA 72 §10.5.2-10.5.3 | Installers qualified or supervised; testers qualified | L3 Install |
| NFPA 72 §10.21 | Impairments: notify owner, AHJ decides mitigation, report outages over 8 hours | L3 Install |
| NFPA 72 §12.3.8 | Class A outgoing and return conductors routed separately; limited exceptions | L3 Install |
| NFPA 72 §14.2.4 | Notify signal recipients and occupants before and after testing | L3 Install |
| NFPA 72 §14.2.10 | Written test plan and documentation of results | L3 Install |
| NFPA 72 §14.4.1-14.4.2 | Initial acceptance (AHJ notified) and reacceptance rules | L3 Install |
| NFPA 72 Table 14.4.3.2 | Initial acceptance column: power, trouble, interfaces, notification, emergency control | L3 Install |
| NFPA 72 §14.6.1 | Permanent records kept by the owner for the life of the system | L3 Install |
| NFPA 72 §17.7.2 and §17.15 | Detectors during construction; manual box operable part 42 to 48 in. | L3 Install |
| NFPA 72 Table 14.4.3.2, item 15 | Conductor tests: stray voltage, isolation, loop resistance (initial only); circuit integrity | L3 Install |
| NFPA 72 §14.2.3 | Owner responsibility; delegation by lease or agreement; ITM by others under a written contract | L3 ITM |
| NFPA 72 §14.2.5 | Record of completion and Chapter 7 information provided to service personnel on request | L3 ITM |
| NFPA 72 §14.2.4 | Notification before testing and when testing is complete | L3 ITM |
| NFPA 72 §14.2.6 | Releasing service: qualified testers, occupant notification, securing the suppression system | L3 ITM |
| NFPA 72 §14.2.10 | Test plan: scope, documented with the testing record | L3 ITM |
| NFPA 72 §14.4.4 and §14.3.1 | Frequency rule: the AHJ's schedule or the table frequency, whichever is more frequent | L3 ITM |
| NFPA 72 Table 14.3.1 | Visual inspection frequencies by component | L3 ITM |
| NFPA 72 Table 14.4.3.2 | Test frequencies and methods (items 4, 8, 9, 17, 18, 24) | L3 ITM |
| NFPA 72 §14.4.2 | Reacceptance testing: added or deleted devices, control unit hardware, software changes | L3 ITM |
| NFPA 72 §14.4.4 | Testing frequency: 18-month limit for inaccessible devices (14.4.4.1), sensitivity (14.4.4.3), interfaced equipment (14.4.4.4) | L3 ITM |
| NFPA 72 §10.5.3 | Qualified personnel for inspection, testing, and service | L3 ITM |
| NFPA 72 Section 10.21 | Impairments: owner notice, AHJ report after 8 hours, mitigation, notice when the impairment ends, 1-year record | L3 ITM |
| NFPA 72 §23.8.2.11 | Remote access for testing, diagnostics, and software updates | L3 ITM |
| NFPA 72 §26.6.2.3 | Remote programming of transmitting technologies | L3 ITM |
| NFPA 72 §14.6 | Records: permanent (14.6.1), ITM (14.6.2), supervising station (14.6.3) | L3 ITM |
| NFPA 72 §7.5.6 and §7.5.7 | Record of completion (revisions, lost originals, electronic filing) and site-specific software documentation | L3 ITM |
| NFPA 72 §7.6.6, §7.7, §7.8.2 | ITM record, record availability and archiving, documentation cabinet, and forms (g) through (l) | L3 ITM |
| NFPA 72 Figure A.14.6.1.1 | Typical input/output matrix (sequence of operation) | L3 ITM |
| NFPA 72 §10.21 | Impairments: notify owner, service provider reports to AHJ after 8 h, mitigation where AHJ requires, notice at end, 1-year record | L3 Impair |
| NFPA 72 §10.21.4 | Service provider reports to the AHJ any system out of service more than 8 hours | L3 Impair |
| NFPA 72 §3.3 (Impairment) | Definition: planned or emergency, system, component, or function inoperable; Annex gives examples | L3 Impair |
| NFPA 72 §3.3 (Deficiency) | Definition: condition that interferes with intended service or reliability | L3 Impair |
| NFPA 72 §3.3 (Observation) | Suggested correction or improvement that is neither impairment nor deficiency; Annex examples | L3 Impair |
| NFPA 72 §14.2.2.2 | Testing creates an impairment only if no manual means or compensatory measure exists | L3 Impair |
| NFPA 72 §14.2.2.3 | Deficiencies shall be corrected; written notice within 24 h if not corrected; recall notice | L3 Impair |
| NFPA 72 §14.2.2.4 | Observations may be communicated; owner need not act | L3 Impair |
| NFPA 72 §14.4.2 | Reacceptance testing after repair, replacement, or modification | L3 Impair |
| NFPA 72 Annex A.14.4.2 | Like-for-like replacement: no 10% sample of unaffected devices; fuse example | L3 Impair |
| NFPA 72 §14.4.2.6 | Remote software changes need a qualified person on site to verify testing | L3 Impair |
| NFPA 72 §7.5.7 | Site-specific software: owner gets a copy, passcode, and programming access or instructions | L3 Impair |
| NFPA 72 §10.22 | Unwanted alarms: find and correct the cause | L3 Impair |
| NFPA 72 §10.3 | Equipment listed for its purpose and compatible with the control unit | L3 Impair |
| NFPA 72 §10.4.7 | Abandoned fire alarm equipment: remove it; mark it not in service until removed | L3 Impair |
| NFPA 72 §10.6.10.1 | Secondary-power batteries: listed or component recognized by a testing laboratory | L3 Impair |
| NFPA 72 §1.4 | Retroactivity: existing installations exempt unless the AHJ finds a distinct hazard; Ch. 14 applies to existing systems | L3 Impair |
| NFPA 72 §1.5 | Equivalency: documentation to the AHJ, approval for the intended purpose | L3 Impair |
| NFPA 72-2022 §10.5.2 | Installation personnel qualified or supervised by qualified persons | L3 Mgmt |
| NFPA 72-2022 §7.5.6 / §7.7 | Record of completion; records and their storage | L3 Mgmt |