Job Site Safety: OSHA 1910/1926 and First Aid

29 CFR 1926 (Subparts E, F, K, L, M, P, X, Z, AA) · 29 CFR 1910 (1910.23, 1910.28, 1910.95, 1910.134, 1910.137, 1910.146, 1910.147, 1910.333, 1910.1200) · 29 CFR 1904 (recordkeeping and reporting) · American Red Cross First Aid/CPR/AED · Outline tasks 1.1.3

What NICET expects at Level I

Task 1.1.3 (Comply with job site safety requirements) belongs to the Installation domain (44–54% of the exam). Its references — OSHA 29 CFR 1910, OSHA 29 CFR 1926, and the American Red Cross First Aid/CPR/AED Participant's Manual — are study-only: they are not allowed in the test center. You will have only the printed NFPA 72, NFPA 70, and Ugly's, so this page is a memorization sheet. The questions are practical: ladders over drop ceilings, drilling concrete overhead, working near energized panelboards, elevator machine rooms, and hot attics.

1926 or 1910? Part 1926 (construction) applies to new installation, renovation, and alterations. Part 1910 (general industry) applies to maintenance, inspection, and testing in existing buildings. If the question says construction site, think 1926; if it says annual testing in an occupied building, think 1910.

Portable ladders (1926 Subpart X; 1910.23)

RuleNumberSection
Side rails above the upper landing surface≥ 3 ft (0.9 m)1926.1053(b)(1); 1910.23(c)(11)
Angle (non-self-supporting ladder)1:4 — base out ¼ of the working length (≈ 75°)1926.1053(b)(5)(i)
Strength4 × the maximum intended load (extra-heavy-duty Type IA metal/plastic: 3.3 ×)1926.1053(a)(1)
Rung spacing10–14 in.1926.1053(a)(3)(i)
Break in elevation that requires a stairway or ladder≥ 19 in.1926.1051(a)
ANSI duty rating (person + tools + material)IAA 375 · IA 300 · I 250 · II 225 · III 200 lbANSI A14 / ladder label

Falls, scaffolds, and lifts

RuleNumberSection
Trigger in construction (edges, holes)6 ft1926.501(b)(1)
Trigger in general industry4 ft1910.28(b)(1)
Trigger on scaffoldsmore than 10 ft1926.451(g)(1)
Guardrail (Subpart M)42 in. ± 3 in.; top rail 200 lb; midrail 150 lb; not below 39 in. under load1926.502(b)
Scaffold guardrail (placed in service after 1/1/2000)38–45 in.1926.451(g)(4)(ii)
Scaffold capacityits own weight + 4 × the intended load1926.451(a)(1)
Scaffold access (never by the cross braces)platform more than 2 ft above/below the access point1926.451(e)(1)
Platformwidth ≥ 18 in.; ≤ 14 in. from the work face; toeboard ≥ 3.5 in.1926.451(b), (h)
Fall arrest anchorage5,000 lb per person1926.502(d)(15)
Free fall / deceleration / maximum force≤ 6 ft / ≤ 3.5 ft / ≤ 1,800 lb with a harness1926.502(d)(16)
Hole covers2 × the load; secured; marked HOLE or COVER1926.502(i)

Electrical safety

Lockout/tagout sequence (1910.147(d); 1910.333(b)(2)):

  1. Prepare: identify every energy source.
  2. Shut the equipment down.
  3. Isolate: open the breaker or disconnect.
  4. Apply lock and tag: each worker applies his or her own; only the person who applied it removes it.
  5. Relieve stored energy.
  6. Verify zero energy before touching anything.

PPE and health hazards

TopicKey factSection
Noiseaction level 85 dBA; PEL 90 dBA (8 h), 95 (4 h), 100 (2 h), 105 (1 h), 115 (¼ h)1910.95, Table G-16
EyesANSI Z87.1 with side protection1926.102
Hard hatANSI Z89.1 (Class E 20,000 V; G 2,200 V; C no electrical protection)1926.100
Required respiratormedical evaluation, fit test before use and every year, no facial hair at the seal1910.134
Silica (handheld drill)PEL 50 µg/m³; shroud with dust collection (filter ≥ 99%) and HEPA vacuum; no respirator1926.1153, Table 1
AsbestosPACM: thermal system insulation and surfacing material in buildings built in 1980 or earlier1926.1101
LeadPEL 50 µg/m³; action level 30 µg/m³1926.62
Safety Data Sheet (SDS)16 sections: 2 hazards, 4 first aid, 7 handling, 8 PPE1910.1200(g)
GHS labelproduct identifier, signal word (Danger > Warning), hazard statements, pictograms, precautionary statements, manufacturer1910.1200(f)

For suspected asbestos (pipe insulation, fireproofing): stop, do not touch it, and report it. With silica: no dry sweeping and no blowing with compressed air.

Other job site hazards

Rights, responsibilities, and records

First aid, CPR, and AED (Red Cross)

SituationWhat to do
Emergency action stepsCheck (scene safe; responsiveness and breathing ≤ 10 s) → Call (911, AED) → Care
Adult CPR100–120/min; ≥ 2 in.; full recoil; 30:2; minimal interruptions
AEDturn on → expose and dry the chest → pads (upper right / lower left) → "CLEAR" → analyze → shock → resume CPR immediately
Electrical injuryshut off power before touching; 911; CPR/AED; entry and exit burns
Severe bleedingdirect pressure; tourniquet 2–3 in. above the wound, not on a joint; note the time
Thermal burncool running water ≥ 10 min; no ice and no butter
Shockhave the person lie flat on the back, keep from getting chilled, 911, nothing to eat or drink
Heat exhaustion vs. heat strokeexhaustion: cool place and fluids; heat stroke (confusion, very hot skin): 911 and rapid cooling, ideally cold-water immersion
Adult choking5 back blows + 5 abdominal thrusts, repeat
Eyechemical: flush with water continuously; embedded object: do not remove it, stabilize, get medical care
Frequent traps: confusing 6 ft (construction), 4 ft (general industry), and more than 10 ft (scaffolds); 42 ± 3 in. (Subpart M guardrail) with 38–45 in. (scaffold); 5,000 lb (anchorage) with 1,800 lb (maximum arresting force); 85 dBA (action level) with 90 dBA (PEL); believing a scissor lift is an "aerial lift" that requires tying off to the structure; thinking a locked-out breaker de-energizes a panel that has batteries; using a tag alone without a lock; CPR "at least 100" instead of 100–120/min.

How to memorize it (OSHA and Red Cross books are not allowed in the test center)

Number ladder: 3 – 4 – 6 – 10 = 3 ft of side rail, 1:4 angle and 4 ft in general industry, 6 ft in construction, 10 ft on scaffolds. Harness: "5-6-3.5-18" = 5,000 lb anchorage, 6 ft free fall, 3.5 ft deceleration, 1,800 lb force. Four times: ladders and scaffolds hold 4 × their load. CPR: "100–120, 2 inches, 30 and 2". Reports: "8 hours fatality, 24 hours hospital, 7 days to the 300 log". Drill these with flash cards — you cannot look them up on exam day.

What to tab in your books

SectionWhy
29 CFR 1926.1053(b)(1)Side rails 3 ft above the upper landing surface
29 CFR 1926.1053(b)(5)(i)1:4 angle (base = ¼ of the working length)
29 CFR 1926.1053(b)(12)–(16)Nonconductive near energized parts; no standing on the top cap; inspection and Do Not Use tag
29 CFR 1926.1051(a)Stairway or ladder at a break in elevation of 19 in. or more
29 CFR 1926.451(a)(1), (e)(1), (g)(1)Scaffolds: 4 × load, access above 2 ft, fall protection above 10 ft
29 CFR 1926.451(g)(4)(ii)Scaffold guardrail 38–45 in.
29 CFR 1926.453(b)(2)Aerial lifts: daily control test, tie off to the boom or basket
29 CFR 1926.501(b)(1) / 1910.28(b)(1)Fall protection trigger: 6 ft / 4 ft
29 CFR 1926.502(b), (d), (i)Guardrail 42 ± 3 in. and 200 lb; anchorage 5,000 lb; free fall 6 ft; hole covers
29 CFR 1910.147(d), (e)(3), (f)(3)Lockout steps, lock removal, group lockout
29 CFR 1910.333(b)(2), (c)(8)Electrical lockout, verification, conductive jewelry
29 CFR 1926.404(b)(1)GFCI or AEGCP on construction sites
29 CFR 1926.405(a)(2), (g)Extension cords and flexible cords
29 CFR 1910.95, Table G-16Noise: 85 dBA action level, 90 dBA PEL
29 CFR 1926.102 / 1910.134Z87.1 eye protection; respirators
29 CFR 1910.1200(f), (g)GHS labels and 16-section SDS
29 CFR 1926.1153, Table 1Silica: controls for drills
29 CFR 1910.146Permit-required confined spaces
29 CFR 1926.150(c)Construction site extinguishers: 2A per 3,000 ft², 100 ft
Red Cross CPR/AED100–120/min, ≥ 2 in., 30:2, AED

Chapter vocabulary

Competent person
Person capable of identifying existing and predictable hazards and authorized to take prompt corrective measures (1926.32(f)).
Qualified person
Person trained in the construction and operation of the equipment and its hazards; in electrical work, the only one allowed to work on parts that are not de-energized.
Authorized employee
The person who applies lockout/tagout to service or maintain the equipment.
Affected employee
A person who operates or works near the locked-out equipment; must be notified before and after the lockout.
Lockout/tagout (LOTO)
Procedure to isolate energy with locks and tags and verify zero energy before work.
Energy-isolating device
Breaker, disconnect, or valve that physically prevents the transmission of energy; a push button is not one.
Ground-fault circuit interrupter (GFCI)
Device that opens the circuit when it detects leakage current to ground; protects people from shock.
Assured equipment grounding conductor program (AEGCP)
Written alternative to GFCIs on construction sites: daily inspection and continuity and connection tests every ≤ 3 months.
Personal fall arrest system (PFAS)
Anchorage, connector, and full-body harness that stop a fall in progress.
Free fall
Distance a person falls before the system starts to slow the fall; 6 ft maximum.
Guardrail system
Top rail, midrail, and posts that prevent falls from an edge.
Toeboard
Low barrier (≥ 3.5 in.) at the platform edge that keeps objects from falling.
Side rail
Either of the two long side members of a ladder.
Top cap
The top of a stepladder; never used as a step.
Duty rating
Maximum ladder load (person + tools + material): IAA 375, IA 300, I 250, II 225, III 200 lb.
Permit-required confined space
Confined space with a hazardous atmosphere, engulfment or entrapment hazard, or other serious hazard.
Attendant
Person who stays outside the confined space, monitors the entrants, and summons rescue.
Safety Data Sheet (SDS)
16-section document with a chemical's hazards, PPE, and first aid.
Signal word
"Danger" (more severe hazard) or "Warning" (less severe) on a GHS label.
Action level
Exposure that triggers measures such as monitoring or conservation programs (for example, 85 dBA for noise).
Permissible exposure limit (PEL)
Maximum legal exposure, usually as an 8-hour time-weighted average (TWA).
Time-weighted average (TWA)
Average exposure over the work shift, usually 8 hours.
Presumed asbestos-containing material (PACM)
Thermal system insulation and surfacing material in buildings constructed in 1980 or earlier.
Automated external defibrillator (AED)
Device that analyzes the heart rhythm and delivers a shock if needed.
Tourniquet
Band tightened 2–3 in. above a limb wound to stop life-threatening bleeding.

55 practice questions cover this chapter, each with an explanation and the code section. Get lifetime access or try the free practice exam.